07Factory
One roof in Weihai.
Cutting, gluing, welding, pressing and packing all sit inside the same 7,000 square metres.
- 7,000m² Plant floor
- 600 Boards a day
- 16,000 Boards a month
- 70 People on site
- 6 In R&D
- 5 In QC
01Floor
Seven thousand square metres, laid out in a line.
The floor runs from fabric and cutting at one end to crating at the other. Boards do not double back, so a run keeps moving in one direction.
02People
Seventy on site, eleven of them technical.
Six work in R&D and five in QC, which is where the 48-hour hold is signed off before packing.
03Capacity and lead time
| Plant floor | 7,000 m² |
|---|---|
| Daily output | 600 boards |
| Monthly output | 16,000 boards |
| Team | 70 people · 6 in R&D · 5 in QC |
| Sample lead time | 10–15 days |
| First production run | 45 days |
VisitWhere to find us
Trimaster Sport (Weihai) Co., Ltd.
No. 6-3, Fenghui Road, Manshan Town, Lingang District, Weihai, Shandong, China