07Factory

One roof in Weihai.

Cutting, gluing, welding, pressing and packing all sit inside the same 7,000 square metres.

  • 7,000m² Plant floor
  • 600 Boards a day
  • 16,000 Boards a month
  • 70 People on site
  • 6 In R&D
  • 5 In QC

01Floor

Seven thousand square metres, laid out in a line.

The floor runs from fabric and cutting at one end to crating at the other. Boards do not double back, so a run keeps moving in one direction.

Wide view of the roller pressing line inside the plant.
The pressing line runs the length of the hall.

02People

Seventy on site, eleven of them technical.

Six work in R&D and five in QC, which is where the 48-hour hold is signed off before packing.

A worker cutting a rail band with shears on a table.
Rail bands are cut by hand to the outline of the board.
A board running through the roller pressing line.
The roller line works a board from end to end.
A worker wiping a finished board in the clean area.
Final wipe-down happens in the clean area before packing.

03Capacity and lead time

Plant floor7,000 m²
Daily output600 boards
Monthly output16,000 boards
Team70 people · 6 in R&D · 5 in QC
Sample lead time10–15 days
First production run45 days

VisitWhere to find us

Trimaster Sport (Weihai) Co., Ltd.

No. 6-3, Fenghui Road, Manshan Town, Lingang District, Weihai, Shandong, China

Book a walk through the line.